  Curtain wall aluminum profiles play a pivotal role in modern architecture, providing both structural support and an aesthetically pleasing facade. To ensure the safety, durability, and functionality of curtain wall systems, strict installation specifications must be adhered to.

  1. Pre - installation Preparation

  Material Inspection: Before installation, thoroughly inspect the curtain wall aluminum profiles. Check for any visible defects such as scratches, dents, or warping. Verify that the profiles match the design specifications in terms of dimensions, alloy type, and surface finish. For example, commonly used aluminum alloys like 6063 - T5 are preferred for their good extrudability and mechanical properties. The surface finish, whether it's anodized, powder - coated, or painted, should also be in line with the project requirements.

  Site Preparation: Clear the installation area of any debris, obstacles, or loose materials. Ensure that the building structure where the curtain wall will be installed is in good condition and can support the weight of the aluminum profiles and the attached cladding materials. Check the accuracy of the building's dimensions, as any significant deviations can affect the proper installation of the curtain wall.

  Tool and Equipment Readiness: Gather all the necessary tools, including measuring tapes, levels, drills, rivet guns, and safety equipment. Calibrate the measuring tools to ensure accurate measurements during installation. Safety equipment such as hard hats, safety glasses, and harnesses are essential, especially for high - rise installations.

  2. Installation Steps

  Skeleton Installation:

  Release Wires and Marking: Securely fix the skeleton of the curtain wall. Bounce the position of the skeleton onto the base and mark the positions accurately. The skeleton, which is usually made of aluminum or steel profiles, is fixed to the main building structure. Before starting the installation, carefully check the quality of the main structure to ensure it can bear the load of the curtain wall.

  Connecting Parts Installation: Weld or bolt joints to the columns of the main structure to fix the skeleton. The joints should be designed and installed to withstand the expected loads, including wind loads, seismic forces, and the weight of the curtain wall itself. For example, in high - rise buildings in windy areas, the joints need to be extra strong to resist the large wind pressures.

  Skeleton Fixing: Pre - treat the skeleton with corrosion - protection measures, such as applying anti - rust paint or using galvanized components. Install the frame with accurate positioning and firm combination. After installation, check the center line and surface elevation. To guarantee the installation accuracy of the curtain wall panels, it is advisable to use a theodolite to align the beam mullion members. Properly treat deformation joints, settlement joints, and variable sections to meet the functional requirements.

  Aluminum Plate Installation:

  Panel Transportation and Cleaning: Transport the aluminum plates to each construction node using appropriate vertical transportation equipment like elevators. Clean the inner side of the aluminum plates and the surface of the column frame with a detergent to remove any dirt, oil, or contaminants. This ensures good adhesion between the plates and the frame.

  Connection and Fixing: Connect the aluminum plates to the keel through surrounding aluminum corners (hanging ears). There are different fixing methods. For seamlessly spliced aluminum plates, use an electric drill to make holes at the corresponding positions on the keel and then use flat - head (countersunk) aluminum rivets to fasten them. For some connections, end screws can be directly drilled into the keel through the connecting hole of the aluminum angle code to fix the aluminum plate. However, it is crucial to control the tightness of the drill bit to adjust the position of the aluminum plate accurately.

  Trial Assembly and Adjustment: Before final installation, make a trial assembly of the aluminum plates. Slightly fix the plates on the keel first, paying close attention to the control of installation accuracy. Adjust the position of the plates until they meet the design requirements, and then tighten the fasteners.

  Sequential Installation: Install the aluminum plates on the wall in sequence according to their numbers. Start from the front, large - area, and corner parts, following the principle of installation from top to bottom. This helps to ensure a consistent appearance and proper alignment of the curtain wall.

  Joint Treatment: The connection between the aluminum plates and the keel must meet the requirements of the drawings, being firm and reliable with proper bolts installed. For curtain wall joints, pay attention to the joint structure and closing treatment. For wall panel joints, to avoid uneven top - bottom or unequal panel gaps, install one side panel first, align it with the line, and use horizontal and vertical control lines to determine the installation position of the other side panel. After both sides meet the requirements, pull out the rivets in turn and install the pressure plate to fix the joint. At the lower end of the wall, make a special water - retaining plate according to the actual size to seal the lower end and cover the gap between the plate and the wall to prevent rainwater from seeping into the building.

  Protection: After installation, cover and protect the parts of the aluminum plates that are prone to contamination with plastic film or other protective materials. During the installation process, take care to protect the plate surface and avoid the plate surface touching the ground to prevent scratching the decorative surface.

  3. Quality Control and Inspection

  Visual Inspection: Regularly conduct visual inspections during and after installation. Check for any misaligned plates, gaps that are too large or too small, and any signs of damage to the profiles or plates.

  Mechanical Testing: For high - rise or large - scale curtain wall projects, consider conducting mechanical tests such as pull - out tests on the fasteners to ensure they can withstand the required loads. Also, check the structural integrity of the skeleton by applying simulated loads (within the allowable range) to ensure it can support the curtain wall system.

  Waterproof and Air - tight Testing: Perform waterproof and air - tight tests on the curtain wall to ensure that it can effectively resist water penetration and air leakage. This is especially important for energy - efficiency and building comfort.

Read recommendations:

aluminium structural sections

water cooling radiator

extruded aluminum tube shapes

aluminium profile for solar panel mounting

Four advantages of aluminum alloy die castings

LEAVE A customers

lf you have any questions or comments, you can leave us a message and we will reply to you as soon as possible

Upload Files

Accepted file types: zip, rar, dxf, dwg, sldprt, slddrw, igs, stp, step, sat, x_t, cgr, ipt, par, jpg, jpeg, gif, png, pdf, xls, xlsx, doc, docx.
Maximum supported file is 5MB, for larger or multiple files please send email to Harvey@greenwayalu.com